Maintaining a Legacy of Superior Quality and Service with MV2 MES

How Schrader Gained Real-Time Visibility, Cut Scrap by 40%, and Boosted Inventory Accuracy by 50%

With customers like GM, Ford, and Mercedes-Benz, Schrader International was already a major force in automotive manufacturing, but inside the plant, the shop floor was a mystery. Orders lacked clear start and due dates, and production data lived in silos. As IT Manager Scott Kadak put it: “The shop floor was kind of a black hole — even to our production veterans.”

That changed when Schrader partnered with ISE.

What began as a small trial deployment quickly transformed the entire operation. The user-friendly interface, real-time reporting, and seamless inventory integration drove rapid adoption across departments. Labor and production data, once delayed and error-prone, became live and reliable. The impact was immediate and measurable:

  • Inventory accuracy increased by 50%

  • Scrap reduction improved by 40%

  • Estimates and quotes became 15% more precise

Plus, with integrated barcode labeling and enhanced traceability, Schrader gained tighter control over every job on the floor.

Read the full Case Study


Discover how our team can help your business design a perfect-fit, enterprise-grade solution that will support and improve operations for years to come. Reach out to an ISE expert today!

Scroll to Top